Planning guide · Updated November 2026
How long does window replacement take?
Replacing a standard window takes 30 to 60 minutes on average, and a large bay or bow window can take up to a full day [1]. Most of the calendar time is everything around install day: the quote, manufacturing, and any permit review.

The timeline, step by step
| Step | Typical time | Notes |
|---|---|---|
| In-home measure and quote | One visit | Every window is measured and checked for rot or water damage. |
| Your right to cancel | 3 days | For a home improvement contract over $25 signed in your home [2]. |
| Lead-safe paperwork (pre-1978 homes) | Before work starts | You receive the Renovate Right pamphlet before work; if mailed, at least 7 days before [3][4]. |
| Permit review (if needed): City of Douglasville | 5–10 business days | Basic reviews; complex projects take longer [5]. |
| Permit (if needed): unincorporated Douglas County | Often same day | When documents are complete and fees paid [6]. |
| Permit review (if needed): Villa Rica | Up to 30 business days | Initial plan review [7]. |
| Manufacturing | Varies by manufacturer | Replacement windows are built to your measurements. Ask for the date in writing. |
| Install | 30–60 min per standard window; up to a day for a bay or bow | [1] |
How to keep your own timeline on track
- Decide early whether you want the same style and size in each opening; changes after ordering restart the manufacturer's clock.
- Ask for the manufacturer's delivery date in writing once the order is placed.
- If your home was built before 1978, expect the Renovate Right pamphlet before any work starts [3][4].
What speeds it up
- Standard sizes and styles. Custom shapes, colors and specialty glass add manufacturing time.
- Insert replacement when the frames are sound. Full-frame replacement adds work at each opening.
- Knowing early whether your address is in the City of Douglasville or unincorporated Douglas County, because the two offices have different review times [5][6].
What slows it down
- Rot or water damage found when the old window comes out.
- A permit that needs plan review, especially for a bigger opening or structural change [5][7].
- Lead-safe setup in a pre-1978 home. Window replacement is always covered by the EPA rule [8], so containment and cleanup are part of the job.
What install day looks like
A crew works one opening at a time, so most of the house stays usable. Old windows come out, new ones are set level, insulated, sealed and trimmed, and the debris leaves with the crew. Plan to clear a few feet in front of each window and to keep pets away from open walls.
Common questions
How long does it take to replace one window?
About 30 to 60 minutes on average for a single-hung window under 10 square feet, according to HomeGuide [1].
Do I need to be home?
For the measure and the walkthrough, yes. For install day, someone should be there at the start and the end.
Related
- How we work
- Window permits by city
- Cost estimator
- Choosing a window contractor
- Signs you need new windows
- Vinyl vs. fiberglass vs. wood
Sources
- HomeGuide, Window Replacement Cost (2026 guide) (published February 5, 2026)
- Georgia Consumer Protection Division, Choosing and Working with a Contractor
- U.S. EPA, Frequent Questions about Pre-Renovation Education
- Georgia EPD, Summary of Georgia Renovation, Repair and Painting Rules
- City of Douglasville, Building Division General Review Process
- Douglas County, Building Permits & Inspections FAQ
- City of Villa Rica, Building Inspections
- U.S. EPA, RRP Program: Information for Contractors
This guide is general information, not legal or financial advice. Where our facts come from.
Get a free window replacement quote
We come to your home, measure every window, and give you a written, itemized quote. Free, and no obligation.